Harbor Bridge Project
 
1-877-227-4144 Facebook Twitter Updates Email
Sign up for Updates
  • About The Bridge
    • Project Overview
    • Construction Maps
    • FAQs
    • Project Facts
  • Traffic Updates
    • Road/Lane Closures
    • Traffic Maps Coming April 2025
    • Safety
  • Bridge News
    • Project Status Reports
    • Press Releases
    • Media
    • Gallery
    • Sidewalk Talks
    • Speakers Bureau
  • Join The Bridge Team
    • Employment Opportunities
    • Vendor Registration
    • Business Opportunities
    • DBE
  • Contact Us
  • Menu
  • Gallery

    Opportunity on the horizon

Outreach Events
Project/Construction
Gantry
N Approach
N CSB
S Approach
S CSB
S RDWKS
Pre Cast Yard
N Approach
Project/Construction

Dec 2024 FDLLC Signing Last Segment
Dec 2024 FDLLC Signing Last Segment
Dec 2024 FDLLC Signing Last Segment

Dec 2024 FDLLC Signing Last Segment
Dec 2024 FDLLC Signing Last Segment
2024 Women In Construction

2024 Women In Construction Event
TAMUCC HBP Visit
TAMUCC HBP Visit

TAMUCC HBP Visit
TAMUCC HBP Visit
TAMUCC HBP Visit

March 2023 CAB Meeting
March 2023 CAB Meeting
March 2023 CAB Meeting

March 2023 CAB Meeting
WIC March ’23
WIC March ’23

WIC March ’23
WIC March ’23
Women in Construction March ’23

January 2023 Ropes Rescue Training with CCFD
January 2023 Ropes Rescue Training with CCFD
January 2023 Ropes Rescue Training with CCFD

October HBP 2022 Media Event
October 2022 HBP Media Event
October 2022 HBP Media Event

April 2022 – Portland TM Clark GT Students
Westside Business Association Presentation September 2021
FDLLC Underwrites Coles High School Graduates gear

ASCE Tour 3
ASCE Tour 4
ASCE Tour 6

ASCE Tour 8
CA Andrew
CA Kim

Chris Amy
HBP Table
Hunter B 2

Hunter B








JB Gracyn 2
JB Gracyn 3

JB 1
JB
Partners

Yolanda
July 2023
June 2023

June 2023
June 2023

April 2025
April 2025
April 2025

January 2025
January 2025
January 2025

January 2025
January 2025
January 2025

January 2025
January 2025
February 2024

February 2024 Salt Flat Channel
February 2024
February 2024

Demolition September 2021
Demolition September 2021
Tina Loader Operator

Stillman Bridge Rebuild Columns Bent
Stillman Bridge Before Demo
Safety Meeting May 7

Pre Cast Mold 2
Port Intersection Demo
Port Intersection Demo 3

Outdoor Skid Steer Training
Maggie Pile Buck Driver









Demo Day 2 equipment
Day 2 Demo section 2 complete

Crane Operators March 2017
Crane Delivered in March 2017
Comanche Beam Placement

Comanch Beam Set Daytime work
Both Sections Complete
Biggie Crane Pic

Approaches column 17
After Day 1
May 2021 Falsework

South Interchange – June 2021
June 2021 Bents 7 – 10
Bents 8 – 10 June 2021

Shared Use Path – November 2021
Nov 2022 All Hands Safety
Nov 2022 All Hands Safety

Nov 2022 All-Hands Safety
Nov 2022 All-Hands Safety
September 2023

North CSB Temporary BS Tower
September 2023
September 2023

August 2023
September 2023
September 2023 ‘all hands safety’

September 2023 ‘all hands safety’
Leopard Street Opening Sept 2023
Leopard Street Opening Sept 2023

Leopard Street Opening Sept 2023
Last Approach Segment Leaving PC& September 2023
April ’24

April ’24
April ’24
April ’24

April ’24
Dec 2024
Dec 2024 Painting

Dec 2024 Last Segments rolling past main FDLLC office
Dec 2024
December 2024 Back Span

Dec 2024 Last Segments to South Pylon
Dec 2024
Dec 2024

Dec 2024 Last Delta Frame Lift
Dec 2024 Main Span

North Pylon - August 2024

Toni * Alexia * Aracelis - 2022

 

 

 

 

 

 

 

 

North US 181 at North Beach - August 2024

August 2024

default

South Pylon - August 2024

South Interchange - August 2024

South Approach - August 2024

South Interchange - August 2024

South Approach - August 2024

August - 2024

August - 2024

August - 2024

August - 2024

August - 2024

South Interchange - August 2024

August 2024

August 2024

South Pylon Back Span Pier Cap - August 2024

South Pylon Back Span Pier Connection - August 2024

South Pylon Back Span Pier Connection - August 2024

Inside South CSB Spans - August 2024

August 2024

North Pylon - August 2024

August 2024

South Pylon - August 2024

August 2024

August 2024

August 2024

August 2024

August 2024

August 2024

Safety Week '24

Safety Week '24

July 2023

Safety week '24

Safety Week '24

Safety Week '24

Safety Week '24

July 2023

July 2023

July 2023

July 2023

New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023

New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023

New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023

All Hands Safety January 2023

February 2023 Hiring Event

February 2023 Hiring Event

February 2023 Hiring Event

All Hands Safety Meeting January 2023

All Hands Safety Meeting January 2023

All Hands Safety Training February 2023

All Hands Safety Training February 2023

All Hands Safety Training February 2023

Lynn * Lydia * Liz * Christina * Montse * Alexei

Aracelis Rodriguez Sanchez - 2022

Lydia * Liz * Christina * Montse * Alexei - 2022

Montse * Liz * Lynn - 2022

 

March 2024 Gantry Removal
March 2024 Gantry Removal
March 2024 Gantry Removal

May 2023
May 2023
April Gantry 2023

April Gantry 2023
March 2023
February ’23

February ’23
February ’23
January 2023

December 2022
December 2022
December 2022

September Gantry
September Gantry
September Gantry

August 2022 Gantry South Approach
August 2022 Gantry South Approach
August 2022 Gantry South Approach

August 2022 Gantry South Approach
July 2022 Gantry
June 2022

June 2022
May 2022
May 2022

March 2022 Gantry over RR
March 2022 Gantry
February 2022 – Sunrise on the Gantry

Nighttime Cantilever Segment Erection – January 2022
January 2022
January 2022

December 2021
Gantry Crane on South Approach – November 2021
November 2021

September 2021
September 2021
September 2021

Gantry – June 2021
Gantry – May 2021
Gantry and Falsework – May 2021

After Day 1
Approaches column 17
Biggie Crane Pic

Both Sections Complete
Comanch Beam Set Daytime work
Comanche Beam Placement

Crane Delivered in March 2017
Crane Operators March 2017
Day 2 Demo section 2 complete

Demo Day 2 equipment









Maggie Pile Buck Driver
Outdoor Skid Steer Training
Port Intersection Demo 3

Port Intersection Demo
Pre Cast Mold 2
Safety Meeting May 7

Stillman Bridge Before Demo
Stillman Bridge Rebuild Columns Bent
Tina Loader Operator

June 2023

April 2025
January 2025
April 2024

April 2024
December 2023
July 2023

July 2023
July 2023
July 2023

Tina Loader Operator
Stillman Bridge Rebuild Columns Bent
Stillman Bridge Before Demo

Safety Meeting May 7
Pre Cast Mold 2
Port Intersection Demo

Port Intersection Demo 3
Outdoor Skid Steer Training
Maggie Pile Buck Driver









Demo Day 2 equipment

Day 2 Demo section 2 complete
Crane Operators March 2017
Crane Delivered in March 2017

Comanche Beam Placement
Comanch Beam Set Daytime work
Both Sections Complete

Biggie Crane Pic
Approaches column 17
After Day 1

June 2021
June 2021
June 2021

September 2021
September 2021
November 2021 Piles for North Approach Final Footings

December 2021
December 2021
December 2021

January 2022 – North Approach
January 2022 – North Approach
March 2022 North Approach

March 2022 North Approach
March 2022 – North Approach
May 2022

May 2022
May 2022
May 2022 North Roadworks

Roadworks May 2022
June 2022
June 2022

June 2022
June 2022
June 2022

June 2022
July 2022
July 2022

July 2022
July 2022 North Roadworks
July 2022 North Roadworks

July 2022 North Roadworks
August 2022 North Approach
August 2022 North Approach Pile Driving

August 2022 North Approach
August 2022 North Roadworks
August 2022 North Roadworks and Pile Driving

September 2022
September 2022
Oct 2022 US 181 North Roadworks

Oct 2022 US 181 North Roadworks
Oct 2022 US 181 North Roadworks
Oct 2022 US 181 North Roadworks

December 2022
January 2023
January 2023

January 2023
February ’23
February ’23

February ’23
February ’23
North Approach Falsework March 2023

North Approach March 2023
March 2023 North Roadworks
March 2023 North Roadworks

April 2023
April 2023
April 2023

May 2023
May 2023
June 2023

September 2023
September 2023
September 2023

September 2023
December 2023
December 2023

February 2024
February 2024
June 2024

 

January ’25
Dec 2024 Last Delta Frame Lift
December 2024 Back Span

Nov 2024 Testing Aesthetic Lighting
Nov 2024
Nov 2024

July 2024
July 2024
July 2024

February 2024
February 2024
February 2024

February 2024
February 2024
February 2024

February 2024
February 2024
February 2024

September 2023
September 2023
September 2023

September 2023
July 2023
July 2023

May 2023
April 2023
April 2023

April 2023
April 2023 Hooks Opening Night
March 2023

March 2023
March 2023
February ’23

February ’23
February ’23
January 2023

January 2023
January 2023
December 2022

December 2022
December 2022
December 2022

September 2022
June 2022
June 2022

June 2022
May 2022
May 2022

May 2022
May 2022
March 2022

March 2022
March 2022
March 2022

March 2022
January 2022
January 2022

January 2022
January 2022
January 2022

January 2022
January 2022
December 2021

December 2021
December 2021
December 2021

December 2021
November 2021 – North Tower
November 2021 – North Tower

North CSB September 2021
North CSB September 2021
Approaches column 17

After Day 1
Biggie Crane Pic
Both Sections Complete

Comanch Beam Set Daytime work
Comanche Beam Placement
Crane Delivered in March 2017

Crane Operators March 2017
Day 2 Demo section 2 complete
Demo Day 2 equipment









June 2022

Maggie Pile Buck Driver
Outdoor Skid Steer Training
Port Intersection Demo 3

Port Intersection Demo
Pre Cast Mold 2
Safety Meeting May 7

Stillman Bridge Before Demo
Stillman Bridge Rebuild Columns Bent
Tina Loader Operator

June 2023
June 2023
August ’23

August ’23
August ’23
August ’23

North CSB December 2023
North CSB December 2023
North CSB December 2023

North CSB December 2023
North CSB December 2023
North CSB December 2023

North CSB December 2023
April ’24
April ’24

April ’24
April ’24
April ’24

April ’24
August 2024
August 2024

August 2024
August 2024

 

November 2024
July 2024
July 2024

July 2024
April ’24
April ’24

February 2024
February 2024
September 2023

August ’23
July 2023
May 2023

May 2023
May 2023
May 2023

April 2023
April 2023
April 2023

March 2023
March 2023
March 2023

Tina Loader Operator
Stillman Bridge Rebuild Columns Bent

Stillman Bridge Before Demo
Safety Meeting May 7
Pre Cast Mold 2

Port Intersection Demo
Port Intersection Demo 3
Outdoor Skid Steer Training

Maggie Pile Buck Driver









Demo Day 2 equipment
Day 2 Demo section 2 complete
Crane Operators March 2017

Crane Delivered in March 2017
Comanche Beam Placement
Comanch Beam Set Daytime work

Both Sections Complete
Biggie Crane Pic
Approaches column 17

After Day 1
June 2021
June 2021

April 2023
June 2021
June 2021

June 2022
June 2021
South Approach September 2021

South Approach September 2021
South Approach Dance Floor September 2021
November 2021 – South Approach

November 2021 – South Approach
November 2021 – South Approach along Salt Flat Channel
December 2021

December 2021
December 2021

December 2021
December 2021
January 2022

January 2022
January 2022
January 2022

January 2022
January 2022
March 2022

March 2022
March 2022
March 2022

March 2022
May 2022 South Approach
May 2022 South Approach

May 2022 South Approach
May 2022 South Approach
June 2022

June 2022
June 2022
June 2022

July 2022
July 2022
July 2022

July 2022
July 2022
July 2022

August 2022 South Approach
August 2022 South Approach
August 2022 South Approach

August 2022 South Approach
August 2022 South Approach
September 2022

September 2022
September 2022
October 2022

October 2022
October 2022
December 2022

December 2022
December 2022
January 2023

January 2023
June 2023
June 2023

June 2023
August ’23
August ’23

December 2023

January 2025
June 2024
June 2024

February 2024
February 2024
February 2024

February 2024
February 2024
February 2024

September 2023
September 2023
July 2023

July 2023
May 2023
May 2023

April 2023
April 2023
March 2023

April 2023 Hooks Opening Night
March 2023
February ’23

February ’23
February ’23
February ’23

January 2023
January 2023
December 2022

December 2022
June 2022
June 2022

June 2022
June 2022
May 2022

May 2022
May 2022
May 2022

March 2022
March 2022
March 2022

March 2022
January 2022
January 2022

January 2022
January 2022
December 2021

December 2021
December 2021
December 2021

South Tower – November 2021
South Tower – November 2021
South Tower – November 2021

South Tower – November 2021
CSB South September 2021
CSB South September 2021

Inner Harbor – March 2021
After Day 1
Approaches column 17

Biggie Crane Pic
Both Sections Complete
Comanch Beam Set Daytime work

Comanche Beam Placement
Crane Delivered in March 2017
Crane Operators March 2017

Day 2 Demo section 2 complete
Demo Day 2 equipment









Outdoor Skid Steer Training
Maggie Pile Buck Driver

Port Intersection Demo 3
Port Intersection Demo
Pre Cast Mold 2

Safety Meeting May 7
Stillman Bridge Before Demo
Stillman Bridge Rebuild Columns Bent

Tina Loader Operator
June 2023
August ’23

August ’23
December 2023 South CSB
December 2023 South CSB

December 2023 South CSB
December 2023 South CSB
December 2023 South CSB

May ’24
May ’24
April ’24

April ’24
April ’24
August 2024

August 2024
August 2024
August 2024

August 2024
August 2024
August 2024

August 2024
November 2024
November 2024

March 2025
March 2025
March 2025

March 2025
March 2025
February 2025

January 2025
January 2025
July 2024

July 2024
July 2024
July 2024

February 2024
February 2024
February 2024

February 2024
February 2024
February 2024

September 2023
Leopard Street Opening Sept 2023
September 2023

September 2023
Leopard Street Opening Sept 2023
Leopard Street Opening Sept 2023

September 2023
August ’23
August ’23

July 2023
July 2023
July 2023

May 2023
May 2023
April 2023

April 2023
April 2023
April 2023

Tina Loader Operator
Safety Meeting May 7
Stillman Bridge Rebuild Columns Bent

Stillman Bridge Before Demo
Pre Cast Mold 2
Port Intersection Demo

Port Intersection Demo 3
Outdoor Skid Steer Training
Maggie Pile Buck Driver









Demo Day 2 equipment

Day 2 Demo section 2 complete
Crane Operators March 2017
Crane Delivered in March 2017

Comanche Beam Placement
Comanch Beam Set Daytime work
Both Sections Complete

Biggie Crane Pic
Approaches column 17
After Day 1

Leopard Street Bridge September 2021
South Interchange – June 2021

Roadworks Construction September 2021
Leopard Street Bridge – June 2021
South Interchange – June 2021

South Interchange – June 2021
South Interchange – June 2021
Leopard Street Bridge – June 2021

IH 37 – June 2021
Roadworks Construction September 2021
South Interchange September 2021

Roadworks Construction September 2021
South Interchange September 2021
South Interchange September 2021

Comanche Street Bridge September 2021
Roadworks Construction September 2021
Northwest Loop Ramp September 2021

Leopard Street Bridge September 2021
South Interchange September 2021
November 2021 – South Interchange

November 2021 – South Interchange
November 2021 – Staples Street Bridge and IH 37
November 2021 – South Interchange

November 2021 – South Interchange
November 2021 – IH 37 and Frontage Roads
November 2021 – South Interchange

December 2021
December 2021
December 2021

December 2021
January 2022
January 2022

January 2022
January 2022
January 2022

January 2022
March 2022
March 2022

March 2022
March 2022
March 2022

May 2022
May 2022
May 2022

May 2022
May 2022
May 2022

June 2022
June 2022
June 2022

June 2022
June 2022
July 2022

July 2022
July 2022
August 2022 South Roadworks

August 2022 South Roadworks
August 2022 South Roadworks
August 2022 South Roadworks

August 2022 South Roadworks
August 2022 South Roadworks
September 2022

September 2022
September 2022
September 2022

Oct 2022
Oct 2022
March 2025

December 2022
December 2022
January 2023

January 2023
January 2023
January 2023

January 2023
January 2023
January 2023

February ’23
February ’23
February ’23

February ’23
February ’23
March 2023 North Roadworks

March 2023
March 2023
June 2023

June 2023
Dec 2023 South Roadworks
Dec 2023 South Roadworks

Dec 2023 South Roadworks
Dec 2023 South Roadworks
Dec 2023 South Roadworks

Dec 2023 South Roadworks
March 2025
Dec 2023 South Roadworks

April ’24
April ’24
April ’24

April ’24
April ’24
April ’24

April ’24
South Approach – August 2024
August 2024

August 2024
August 2024
August 2024

Nov/Dec 2024
Nov/Dec 2024
Nov/Dec 2024

Nov/Dec 2024
Nov/Dec 2024 New IH 37 EB frontage extension and ramp to NB US 181
Nov/Dec 2024 New IH 37 EB frontage extension from Port Ave to Staples St

 

 

PCY August 2024

May '24

April '24

 

 

 

 

 

 

 

May '24

May '24

September '23 Last approach segment leaving PCY

September '23 Last approach segment leaving PCY

July 2023

July 2023

April 2023

April 2023

December 2022

June 2022

June 2022

June 2022

June 2022

June 2022

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

PCY Oct '21

 

 

 

PCY Oct '21

 

April 2024
April 2024
May 2023

May 2023
April 2023
April 2023

April 2023
March 2023 North Roadworks
March 2023 North Roadworks

North Approach March 2023
North Approach Falsework March 2023
February ’23

February ’23
February ’23
February ’23

January 2023
January 2023
January 2023

December 2022
Oct 2022 US 181 North Roadworks
Oct 2022 US 181 North Roadworks

Oct 2022 US 181 North Roadworks
Oct 2022 US 181 North Roadworks
September 2022

September 2022
August 2022 North Roadworks and Pile Driving
August 2022 North Roadworks

August 2022 North Approach
August 2022 North Approach Pile Driving
August 2022 North Approach

July 2022 North Roadworks
July 2022 North Roadworks
July 2022 North Roadworks

July 2022
July 2022
July 2022

June 2022
June 2022
June 2022

June 2022
June 2022
June 2022

Roadworks May 2022
May 2022 North Roadworks
May 2022

May 2022
May 2022
March 2022 – North Approach

March 2022 North Approach
March 2022 North Approach
January 2022 – North Approach

January 2022 – North Approach
December 2021
December 2021

December 2021
November 2021 Piles for North Approach Final Footings
September 2021

September 2021
June 2021
June 2021

June 2021
After Day 1
Approaches column 17

Biggie Crane Pic
Both Sections Complete
Comanch Beam Set Daytime work

Comanche Beam Placement
Crane Delivered in March 2017
Crane Operators March 2017

Day 2 Demo section 2 complete
Demo Day 2 equipment









Maggie Pile Buck Driver
Outdoor Skid Steer Training

Port Intersection Demo 3
Port Intersection Demo
Pre Cast Mold 2

Safety Meeting May 7
Stillman Bridge Before Demo
Stillman Bridge Rebuild Columns Bent

Tina Loader Operator
July 2023
July 2023

Safety Week '24


Safety Week '24


Safety Week '24


July 2023


Safety week '24


Safety Week '24


Safety Week '24


Safety Week '24

July 2023


July 2023


July 2023


July 2023


New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023


New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023


New Roadway, Sidewalks, and Curb at Doss and Mestina Street - March 2023


All Hands Safety January 2023


February 2023 Hiring Event


February 2023 Hiring Event


February 2023 Hiring Event


All Hands Safety Meeting January 2023


All Hands Safety Meeting January 2023


All Hands Safety Training February 2023


All Hands Safety Training February 2023


All Hands Safety Training February 2023


Lynn * Lydia * Liz * Christina * Montse * Alexei


Aracelis Rodriguez Sanchez - 2022


Lydia * Liz * Christina * Montse * Alexei - 2022


Montse * Liz * Lynn - 2022


Toni * Alexia * Aracelis - 2022

April ’24
April ’24
April ’24

April ’24
April ’24
Last Approach Segment Leaving PC& September 2023

Leopard Street Opening Sept 2023
Leopard Street Opening Sept 2023
Leopard Street Opening Sept 2023

September 2023 ‘all hands safety’
September 2023 ‘all hands safety’
September 2023

August 2023
September 2023
September 2023

North CSB Temporary BS Tower
September 2023
Nov 2022 All-Hands Safety

Nov 2022 All-Hands Safety
Nov 2022 All Hands Safety
Nov 2022 All Hands Safety

Shared Use Path – November 2021
Bents 8 – 10 June 2021
June 2021 Bents 7 – 10

South Interchange – June 2021
May 2021 Falsework
After Day 1

Approaches column 17
Biggie Crane Pic
Both Sections Complete

Comanch Beam Set Daytime work
Comanche Beam Placement
Crane Delivered in March 2017

Crane Operators March 2017
Day 2 Demo section 2 complete
Demo Day 2 equipment









Maggie Pile Buck Driver

Outdoor Skid Steer Training
Port Intersection Demo 3
Port Intersection Demo

Pre Cast Mold 2
Safety Meeting May 7
Stillman Bridge Before Demo

Stillman Bridge Rebuild Columns Bent
Tina Loader Operator
Demolition September 2021

Demolition September 2021
February 2024
February 2024

February 2024 Salt Flat Channel
February 2024

ABOUT THE BRIDGE

  • Project Overview
  • Construction Maps
  • FAQs
  • Project Facts

TRAFFIC UPDATES

  • Road/Lane Closures
  • Traffic Maps Coming April 2025
  • Safety
  • DriveTexas.org

BRIDGE NEWS

  • Press Releases
  • Media
  • Gallery
  • Sidewalk Talks
  • Speakers Bureau
  • Project Status Reports

JOIN THE BRIDGE TEAM

  • Employment Opportunities
  • Vendor Registration
  • Business Opportunities
  • DBE
CONTACT US

1-877-227-4144

Office Hours:
Mon.-Fri. 8am-5pm

Facebook Twitter Email Updates Contact Us
Satori Marketing
© Copyright 2018 Harbor Bridge Project | All Rights Reserved

1. The new bridge is expected to last 170 years.

2. Includes LED lighting feature, belvedere and shared-use path.

3. Main Tower Height = 538 ft

4. The base of each bridge tower is roughly the size of two basketball courts.

5. Once complete, will be the longest cable stay bridge in the United States.

6. Main Span Length = 1661 ft

7. Clearance = 205 ft above water

8. The length of the main span of the bridge is equivalent to the length of 5 ½ football fields.

9. Once complete, will be the tallest structure in South Texas.

    Get Certified

      Sign up for Updates