Upcoming Harbor Bridge Project temporary closure to affect the Northwest Loop Ramp from Martin Luther King Drive to southbound SH 286 (Crosstown Expressway). Temporary closure to be in effect March 5 – 6.

CORPUS CHRISTI – On Sunday, March 5, from noon until 6 am, Monday, March 6, the Northwest Loop Ramp from Martin Luther King Drive to southbound SH 286 will be temporarily closed. The closure is necessary for demolition and excavation around the south interchange.

Motorists heading southbound on US 181 to southbound SH 286 will be detoured to continue northbound on IH 37, take the Up River Road exit, make a U-turn, and continue southbound on IH 37 to the connector ramp for southbound SH 286.

Motorists leaving the bayfront area to southbound SH 286 will continue northbound on IH 37, take the Up River Road exit, make a U-turn, and continue southbound on IH 37 to the direct connector ramp for southbound SH 286.

Portable message signs will be in place to assist with navigating the alternate route.

Motorists are urged to be aware of the temporary closure, consider using alternate routes, follow all traffic control devices, and to slow down in the work zones. All work is weather permitting.

For information about all current and upcoming lane closures related to the Harbor Bridge Project, visit www.harborbridgeproject.com.

For information about all current and upcoming lane closures related to the Harbor Bridge Project, visit www.harborbridgeproject.com.